<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
  <head>
    <meta content="text/html; charset=UTF-8" http-equiv="Content-Type">
  </head>
  <body bgcolor="#ffffff" text="#000000">
    I came across this<br>
    <br>
    <a class="moz-txt-link-freetext" href="http://antarcticsun.usap.gov/features/contenthandler.cfm?id=4086">http://antarcticsun.usap.gov/features/contenthandler.cfm?id=4086</a><br>
    <br>
    and it got me thinking about the priorities. NSF is operating a
    number of winter C17 flights this year and moving towards opening up
    the winter - for logistics. At the same time we are being told we
    have to live with the reality of this C17 gap in the middle of the
    field season. Is there a connection between the two? Where is the
    science justification for the winter access? 'is this new winter
    access coming at the cost of summer science support. we could sure
    use a couple of those winter C17 flights in late December or early
    January. Reading the justification for the winter flights, there is
    nothing about science.<br>
    <br>
    <pre class="moz-signature" cols="72">Peter Doran, Professor and John Franks Chair
Department of Geology and Geophysics
E235 Howe Russell Geosciences Complex
Louisiana State University
Baton Rouge, Louisiana, USA 70803

Ph: 225-578-3955
Fx: 225-578-2302

<a class="moz-txt-link-freetext" href="http://geology.lsu.edu/People/Faculty/item73533.html">http://geology.lsu.edu/People/Faculty/item73533.html</a></pre>
    <br>
    <br>
    On 5/29/15 2:26 PM, Michael Gooseff wrote:
    <blockquote
      cite="mid:3EE3A441-23BC-4E65-B5C6-1509A88414CF@colorado.edu"
      type="cite">
      <meta http-equiv="Content-Type" content="text/html; charset=UTF-8">
      Hi all,
      <div class=""><br class="">
      </div>
      <div class="">I spoke with Lisa about this today and learned a bit
        about the reasoning.  I pointed out the unfortunate timing to
        communicate this <b class=""><i class="">AFTER </i></b>SIPs
        were due, etc. and that we are academic creatures who are trying
        to work around teaching responsibilities.  She understood both
        points and admitted that she hadn’t been to many of the PLR
        staff meetings lately because of her new role in OCE.  </div>
      <div class=""><br class="">
      </div>
      <div class="">The challenge that NSF is grappling with is that the
        ‘new normal’ is going to be reliance on the limited fleet of
        LC-130s during the C-17 gap.  The idea this year is to dedicate
        the 130s to <u class="">science</u> during this period (science
        around the continent).  Last year the mission completion rate
        (planned vs completed) was about 50% on the ice because of the
        mulitple commitments of the 130s.  The way they are handling
        this is to dedicate a period to ‘on ice missions’ during this
        part of the season.  Again, unfortunate that they decided this
        AFTER the SIPs were submitted…  I plan to call Jessie Crain to
        discuss.  This week is her first week back from maternity leave,
        so I’ll inquire today about setting up a time to chat next week.
         </div>
      <div class=""><br class="">
      </div>
      <div class="">Chris and I have a meeting with Liz set up for next
        Wednesday afternoon, and we will pursue the issue there as well.</div>
      <div class=""><br class="">
      </div>
      <div class="">I’ll pass along more as it comes available.</div>
      <div class=""><br class="">
      </div>
      <div class="">cheers</div>
      <div class="">-Mike</div>
      <pre wrap="">
<fieldset class="mimeAttachmentHeader"></fieldset>
_______________________________________________
Long Term Ecological Research Network
mcm-pi mailing list
<a class="moz-txt-link-abbreviated" href="mailto:mcm-pi@lists.lternet.edu">mcm-pi@lists.lternet.edu</a>
</pre>
    </blockquote>
    <br>
  </body>
</html>